SHIPYARD & FACILITIES
Gisan Shipyard in Tuzla, Istanbul, brings together facilities supporting ship repair, steel work, surface preparation and newbuilding.
INFRASTRUCTURE & CAPABILITY
Gisan Shipyard operates in Tuzla with integrated production infrastructure supporting ship repair, maintenance, docking and newbuilding.
ENGINEERING & CAPACITY
Quay
The yard has approximately 150 metres of quay length available.
Newbuilding Capability
Gisan Shipyard builds new vessels on two slipways.
Slipway supported-vessel capacity · up to
- First slipway
- 17,240 DWT4,590 tonnes
- Second slipway
- 12,900 DWT3,430 tonnes
TECHNICAL FACILITIES
Cranes & Lifting
- Overhead travelling cranes: 3 units (6, 10 and 20 tonnes)
- Gantry cranes: 6 units (capacities ranging from 10 to 75 tonnes)
- Rail-mounted jib cranes on the floating dock: 2 units (10+10 tonnes)
Quay & Additional Lifting
- Rail-mounted tower cranes on the quay: 2 units (10+15 tonnes)
- Additional cranes of various types (2×10 and 2×5 tonnes)
Workshop & Machinery
- Forklifts with capacities up to 10 tonnes
- CNC plate-cutting table (6 m × 20 m)
- Hydraulic and mechanical presses (180 to 450 tonnes)
Compressed Air & Power
- Compressor units (2×45 m³/min and 1×22 m³/min, 8 bar)
SHIPYARD TECHNICAL DATA
Technical capacity & facilities
Facility area
- Total area
- 18,066 m²
- Enclosed area
- 4,938 m²
- Open area
- 13,128 m²
Repair & maintenance capacity
- Annual repair capacity
- 500.000 DWT / year
- Annual repair & maintenance volume
- 60–70 vessels / year
- Average repair-related steel processing
- 1,800 t / year
Floating dock & waterfront
- Floating dock
- 1 unit
- Floating-dock lifting capacity
- 8,000 t
- Floating-dock dimensions
- 155.48 m × 32 m
- Quay / pier dimensions
- 11.65 m × 150 m
- Pier dimensions and water depth / draft
- 13 m × 150 m; 8 m draft
Quay and pier dimensions are presented as separate contexts.
Building slipways
- Slipway I — physical dimensions
- 23 m × 150 m
- Slipway II — physical dimensions
- 20 m × 130 m
- Slipway I — supported vessel
- Up to 156 m; 17,240 DWT; 4,590 t
- Slipway II — supported vessel
- Up to 138 m; 12,900 DWT; 3,430 t
Cranes & lifting equipment
- Production-area crane 1
- 1 × 35 t
- Production-area crane 2
- 1 × 25 t
- Production-area crane 3
- 1 × 20 t
- Production-area crane 4
- 1 × 10 t
- Slipway crane 1
- 1 × 150 t gantry crane
- Slipway crane 2
- 1 × 120 t gantry crane
- Enclosed-area crane 1
- 1 × 10 t overhead crane
- Enclosed-area crane 2
- 1 × 20 t overhead crane
- Pier crane 1
- 1 × 10 t
- Pier crane 2
- 1 × 30 t
- Hydraulic platform
- 4 units
- Floating-dock / dock crane
- 2 × 10 t jib crane
- Cherry picker
- 4 units
Yard & fabrication equipment
- Forklift 1
- 10 t
- Forklift 2
- 7 t
- Forklift 3
- 6 t
- Bobcat
- 1 unit
- CNC plate-cutting working dimensions
- 6 m × 20 m
- Vertical press
- 1 × 450 t
- Box-type press
- 400 t
- Eccentric press
- 180 t
Compressed air & power
- Compressor group 1
- 2 × 45 m³/min; 8 bar
- Compressor group 2
- 1 × 22 m³/min; 8 bar
- Total transformer capacity
- 7,350 kVA
- Generator
- 550 kVA; 220 / 380 V
Steel & coating capacity
- Yard-wide steel-processing capacity
- 20.000 tonnes / year
- Painting / surface capacity — daily
- 760 m² / day
- Painting / surface capacity — annual
- 400.000 m² / year
Historical operating data records 508 personnel, including subcontractor personnel. This historical personnel record is not presented as a headcount associated with current capacity.
Refit & conversion project types
- Tankers
- General cargo vessels
- Cement carriers
- Ro-Ro vessels
- Offshore support vessels
- Asphalt tankers
- Platform support vessels
- Seismic survey vessels
Repair vessel & project types
- Offshore platforms
- Crude oil tankers
- Chemical tankers
- Ro-Ro vessels
- Ferries
- General cargo vessels
- Refrigerated cargo vessels
- Dredgers
- Tugs
- Fishing vessels
- LPG / LNG tankers
- Container vessels
- Cable-laying vessels
- Cement carriers
- Bulk carriers
- Livestock carriers
- Deck barge projects
- Submersible heavy-lift vessels
- Timber / log carriers
- Passenger vessels
- Other powered and unpowered marine craft
FACILITY GALLERY
TECHNICAL CONSULTATION
Discuss your project
Share vessel particulars, principal dimensions, planned dates and work scope.